top of page

Building Progress Update

Great things are happening at the church! After a lot of hard work the walls for the classrooms, halls and auditorium have been painted. Carpet and tile have been installed in most rooms. The sound booth has been built as well as having the new chairs in the building. The drop ceiling and kitchen cupboards are being installed as we speak! Thanks to everyone who has sacrificed their time to help with the church build!

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page